Pengadaan berdasarkan pesanan dari pemasok eksternal di TiongkokIndonesia | Koordinasi FOB / CFR / CIF
Mutu & dokumen

Konfirmasikan Bukti Sebelum Memesan

Mutu adalah spesifikasi, metode penerimaan, dan bukti yang dapat diberikan pemasok terpilih.

Direct answer

What Jingtong can coordinate

We can collect buyer requirements, check supplier document options and align commercial conditions. Jingtong does not replace the project engineer, certification body, inspection agency or manufacturer.

Titik kontrolHarus dinyatakan pembeliHarus dikonfirmasi pemasok
Product standardBuyer states the applicable standard and editionSupplier confirms manufacturing basis
Dimensions / tolerancesBuyer states critical acceptance limitsSupplier confirms achievable limits
Material test certificateBuyer states required MTC format or dataAvailability confirmed per supplier and order
Zinc coatingBuyer states process and g/m2, microns or project criteriaSupplier confirms inspection basis
Third-party inspectionBuyer states agency, scope and timingFeasibility and cost confirmed before order
Marking and packingBuyer states shipping marks and protection needsSupplier confirms final packing plan
Export documentsBuyer states destination and importer needsDocument availability confirmed per transaction
RFQ discipline

Put mandatory documents in the RFQ

If a document or inspection is required for customs, payment, project acceptance or site delivery, state it before quotation. Adding it after the order can change feasibility, price and lead time.

Useful attachment set

  • Project specification or standard
  • BOQ or size schedule
  • Drawing and tolerances
  • Inspection and document list
  • Packing and marking requirement
Kirim RFQ
Produk Kirim RFQ