基于订单匹配中国外部供应商阿联酋及沙特 | FOB / CFR / CIF 协调
质量与单证

下单前确认可交付的证据

质量不是口号,而是双方确认的规格、验收方法和供应商能够提供的证据。

Direct answer

What Jingtong can coordinate

We can collect buyer requirements, check supplier document options and align commercial conditions. Jingtong does not replace the project engineer, certification body, inspection agency or manufacturer.

控制项目买家应明确供应商需确认
Product standardBuyer states the applicable standard and editionSupplier confirms manufacturing basis
Dimensions / tolerancesBuyer states critical acceptance limitsSupplier confirms achievable limits
Material test certificateBuyer states required MTC format or dataAvailability confirmed per supplier and order
Zinc coatingBuyer states process and g/m2, microns or project criteriaSupplier confirms inspection basis
Third-party inspectionBuyer states agency, scope and timingFeasibility and cost confirmed before order
Marking and packingBuyer states shipping marks and protection needsSupplier confirms final packing plan
Export documentsBuyer states destination and importer needsDocument availability confirmed per transaction
RFQ discipline

Put mandatory documents in the RFQ

If a document or inspection is required for customs, payment, project acceptance or site delivery, state it before quotation. Adding it after the order can change feasibility, price and lead time.

Useful attachment set

  • Project specification or standard
  • BOQ or size schedule
  • Drawing and tolerances
  • Inspection and document list
  • Packing and marking requirement
提交询盘
产品中心 提交询盘